A cost plan ready for tender. Brief: Scope and quality; Plans: Current revision and quantities; Specification: Systems, products and finishes; Allowances: Open gaps and review actions. Reconcile the move from the last cost plan.
QSEC insight

Does Your Cost Plan Match The Job You Will Tender?

A cost plan should price the work you intend to tender. Before issue, check that it matches the brief, drawings and specification so contractors can price the same scope.

A cost plan should price the work you intend to tender. Before issue, check that it matches the brief, drawings and specification so contractors can price the same scope.

Can another reader trace your budget back to the scope that was priced?

A cost plan ready for tender. Brief: Scope and quality; Plans: Current revision and quantities; Specification: Systems, products and finishes; Allowances: Open gaps and review actions. Reconcile the move from the last cost plan.
Reconcile the move from the last cost plan.

State What Was Priced

List the drawings, versions and price date used. Show the quantities and rate sources, with a clear note where an allowance or benchmark is used.

Include site costs, overheads and profit on the stated basis. Say how fees, VAT, inflation and other client costs are treated.

Give Each Gap A Next Step

For each allowance, state what it covers and which facts are missing. Keep known work apart from risk so the same cost is counted once.

If the plan exceeds the budget, show the gap. The team can then change scope, design or funds, rather than cut a sum without changing the work.

Your total may fit the budget. Does it price the same job as the tender pack?

Keep the plan tied to the tender
  1. Basis

    List the scope, versions and price date.

  2. Gaps

    Show allowances, risks and missing facts.

  3. Movement

    Explain changes and name the next action.

QSEC · Use these checks with the facts and terms of your job.

Use that same basis to check the tender returns and any proposed saving.

Explain The Move Since The Last Plan

Use the same cost breakdown to show changes in scope, quantities, rates and risk. Name who needs to act on each open point and by when.

Before tender, confirm that the pack and plan describe the same work. Keep that basis for the bid review so a lower offer can be judged on what it includes.

General guidance. Check your signed contract and the job facts. Get legal advice where needed.

General guidance This article is not project-specific contractual or legal advice. Review the signed contract and facts before acting.