A Lower Price Is Only A Saving If The Job Still Works

A cheaper product can cost more once the whole change is priced. New drawings, wasted work or longer lead times may use up the saving shown in the quote.

A cheaper product can cost more once the whole change is priced. New drawings, wasted work or longer lead times may use up the saving shown in the quote.

A lower quote catches the eye. What does changing the design add back?

What is the real saving?. Quote saving: Same finished scope; Less change costs: Design, lost work, site time; Net saving: Check quality and lead time. Approve the option on its whole cost and outcome.
Approve the option on its whole cost and outcome.

Value Engineering In Construction: Agree The Required Result

List the function, quality and standards the work must meet. Check the current design and cost before seeking other ways to achieve them.

Value engineering can change layout, work sequence or buying as well as a product. Bring design and site views into the review.

Count The Net Saving

Compare options on the same scope and quantities. Deduct new design work, checks, abortive work and extra site time from the price saving.

Check lead times, upkeep and running costs too. Add carbon effects where the brief needs them. State what must happen for the saving to be achieved.

The headline saving is only the start. What remains after the change costs?

Check the saving that survives
  1. Quote saving

    Compare the same finished scope.

  2. Change costs

    Allow for redesign, lost work and extra site time.

  3. Net result

    Check the saving after those costs.

QSEC · Use these checks with the facts and terms of your job.

Use the net result, together with function, quality and time, to decide whether to proceed.

Approve And Track The Option

Name who can agree the change and record the reason, sum and date. Update the drawings, orders and forecast when it is approved.

Early reviews leave more room to change the design. Keep options rejected and the reasons so the team does not repeat the same work without new facts.

General guidance. Check your signed contract and the job facts. Get legal advice where needed.

General guidance This article is not project-specific contractual or legal advice. Review the signed contract and facts before acting.

Need a clearer commercial position on your project?

Discuss the requirement