QSEC insight

Is Your Build Budget Ready For Tender?

A cost plan can fit the budget while the tender pack prices a different job. Check the two together before issue so the returns do not reveal scope gaps too late.

A cost plan can fit the budget while the tender pack prices a different job. Check the two together before issue so the returns do not reveal scope gaps too late.

Can every bidder see the same job in the tender pack?

Match the tender to the budget. Scope: Latest plans and specification; Time: Access, phases and duration; Allowances: Basis and outstanding details; Price date: Treatment of price rises. The cost plan and tender pack must price the same job.
The cost plan and tender pack must price the same job.

Tender Budget Checklist: Match The Pack And Price

Use the latest drawings, specification and schedules to check each cost item. State what is fixed and what the contractor must design.

Check access, phases and site time too. State the price date and how price rises up to tender have been allowed for.

Resolve The Key Gaps

Give each missing detail an owner and date. Test broad allowances against quotes and keep the basis of remaining risk clear.

If the design costs too much, address scope or funds while the team has choices. A low bid is not a plan to make a costly design affordable.

A tidy total can hide an unfinished brief. Which part of the tender basis is still open?

Is the job ready to price?
  1. Scope

    Drawings, specification and cost plan agree.

  2. Programme

    Access, phases and duration are stated.

  3. Risk

    Allowances have a basis and a next action.

QSEC · Use these checks with the facts and terms of your job.

Close those gaps or give them a stated basis before treating the tender figures as comparable.

Prepare To Compare The Bids

Agree who checks the scope, terms and prices before returns arrive. Read what each offer leaves out so the totals can be compared fairly.

The design detail needed depends on the procurement route. Keep the priced basis and open points in view through tender, review and award. Hand them to the site team once the work is placed.

General guidance. Check your signed contract and the job facts. Get legal advice where needed.

General guidance This article is not project-specific contractual or legal advice. Review the signed contract and facts before acting.