Payment notices: three checks. Sum: Amount and calculation basis; Date: Contractual timetable; Route: Correct recipient and method; Proof: Dated evidence of service. Use the signed terms and the law for the job.
QSEC insight

Payment Notices: Check The Sum, The Date And The Route

A payment notice needs more than the right total. Its basis, timing and service also matter. Build the process from the signed terms and the law for the job.

A payment notice needs more than the right total. Its basis, timing and service also matter. Build the process from the signed terms and the law for the job.

A correct sum can still be undermined by the wrong date or recipient. What do your terms require?

Payment notices: three checks. Sum: Amount and calculation basis; Date: Contractual timetable; Route: Correct recipient and method; Proof: Dated evidence of service. Use the signed terms and the law for the job.
Use the signed terms and the law for the job.

Payment Notice And Pay Less Notice: Check The Dates

Record the due date, notice dates and final date for payment. Check the recipient and allowed service route in the signed terms.

Read changes to the form too. Do not copy dates from an old job or assume any email address is the correct route.

State The Sum And Basis

A payment notice and a pay less notice serve different roles. State the sum thought due and the basis required for that notice.

Show the work value, changes, deductions and prior payments clearly. Check that any schedule adds up to the notice sum and keep proof of service.

An old template saves time. Does it match this contract’s notice process?

Check the notice before the clock runs out
  1. Sum and basis

    State the required amount and calculation.

  2. Date

    Use this job’s contractual deadlines.

  3. Recipient and route

    Serve correctly and keep the receipt.

QSEC · Use these checks with the facts and terms of your job.

Check the content, timing and service route together against the signed terms.

Act If A Step Is Missed

A late notice may not fix the gap. Where the Construction Act applies, the notified sum has a specific role in what must be paid.

Use the right law and Scheme for the job's jurisdiction. Get prompt advice on missed dates or disputed notice rights, rather than rely on a later deal to cure the issue.

General guidance. Check your signed contract and the job facts. Get legal advice where needed.

General guidance This article is not project-specific contractual or legal advice. Review the signed contract and facts before acting.