Price the whole site duration. Set-up: One-off start costs; Management: Staff × planned weeks; Welfare and plant: Time on site; Close-out: Removal and completion. Check trade quotes for gaps and double counting.
QSEC insight

Did You Price The Site Costs For The Whole Job?

Preliminaries are the costs of setting up, running and closing the site. A flat percentage may miss the staff, welfare or access needed for the planned time and scope.

Preliminaries are the costs of setting up, running and closing the site. A flat percentage may miss the staff, welfare or access needed for the planned time and scope.

A cheaper site allowance is useful only if the job can run within it. Can it?

Price the whole site duration. Set-up: One-off start costs; Management: Staff × planned weeks; Welfare and plant: Time on site; Close-out: Removal and completion. Check trade quotes for gaps and double counting.
Check trade quotes for gaps and double counting.

Build Preliminaries In Construction Tenders From The Site Plan

Read the tender duties and price site staff, welfare, plant and security. Check power, water, waste and the tasks needed at the end.

Allow for access, phases and live-site limits. The same trade value can need very different site support on two jobs.

Split Costs By Their Driver

Some costs arise once. Others grow each week or follow a task. Show setup and close-out time as well as the main work period.

A reduced allowance needs a real change in the plan. If a manager is needed for twelve weeks, pricing eight does not create a saving.

Eight weeks may look cheaper than twelve. Does the programme support eight?

Build preliminaries from the site plan
  1. Set up

    Price the one-off mobilisation costs.

  2. Run the site

    Link weekly costs to the needed duration.

  3. Close out

    Include clearance, testing and demobilisation.

QSEC · Use these checks with the facts and terms of your job.

Use the actual setup, running period and closeout plan to build the allowance.

Check Gaps And Overlaps

Read trade quotes to confirm who provides lifting, access and site help. Count each cost once and keep office overheads on a clear basis.

Test what a longer job would cost. More site time does not alone prove a right to delay costs; the terms, cause and records must support it.

General guidance. Check your signed contract and the job facts. Get legal advice where needed.

General guidance This article is not project-specific contractual or legal advice. Review the signed contract and facts before acting.

Need a clearer commercial position on your project?

Discuss the requirement